Overpass over the railway, replacement of the “Bridge of Lies”, Blaj

PROJECT SUMMARY

The object of this project is the design and execution of the investment objective Overpass over the railway, replacement of the “Bridge of Lies”, Blaj municipality.

The project includes the demolition of an old bridge in the center of the Blaj municipality and the construction of a new one, with 5 lanes and 2 lanes for pedestrian traffic (covered and heated sidewalks). The new bridge will be one of the most spectacular constructions in Romania, with contemporary architectural solutions but respecting the existing heritage in the area.

The value of the investment, technical project and execution of works, is 11,749,709.85 lei (excluding VAT).